Projects in the fieldacross Myanmar
Telecom power sites, rooftop and ground-mounted solar, and energy storage — a selection of our installations.
Project gallery
Inspiration from ourprevious projects
Click a photo to enlarge.
What we deliver
Telecom power andsolar integration
Telecom power related projects
Cutting-edge telecom power solutions for Myanmar’s largest tower companies — Irrawaddy Green Tower (IGT), Pan Asia Eagle and Apollo Towers.
- Mass roll-outs (2014–2017) — power systems for nationwide telecom infrastructure
- Capacity upgrades (2016–2020) — enhanced power supply to meet rising demand
- Energy optimization (2020–present) — solar hybrid systems to reduce fuel costs
Solar system integration projects
Over 2.5 MWp of solar capacity deployed across Myanmar for industrial, commercial and residential clients.
- Solar hybrid systems for telecom towers — reducing diesel dependency for major operators
- Commercial & industrial installations — custom solar arrays to cut energy costs and carbon footprint
- Sole distributor partnerships — Gamko Solar panels and Helith HV batteries
0Founded by electrical engineers
0Major tower operators served
0Solar capacity installed
0Business units
Let’s plan your energy solution.
Telecom power, solar and energy storage, or electrical engineering — tell us about your site and we will get back to you.
Get a free quote